EasyManua.ls Logo

Daikin VRVII - Special Vacuuming and Dehydration; Vacuum Break

Daikin VRVII
385 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Troubleshooting by Indication on the Remote Controller
364
<Special vacuuming and dehydration> - In case of
moisture may get mixed in the piping
(1) Vacuuming and dehydration
Follow the same procedure as that for 1) Normal
vacuuming and dehydration described above.
(2) Vacuum break
Pressurize with nitrogen gas up to 0.05MPa.
(3) Vacuuming and dehydration
Conduct vacuuming and dehydration for a period
of one hour or more. If the degree of vacuum does
not reach -100.7kPa or less even though
evacuation is conducted for a period of two hours
or more, repeat vacuum break - vacuuming and
dehydration.
(4) Leaving in vacuum state
Leave the compressor at the degree of vacuum of
-100.7kPa or less for a period of one hour or more,
and then check to be sure that the vacuum gauge
reading does not rise.
(5) Additional refrigerant charge
Purge air from the manifold gauge connection
hoses, and then charge a necessary amount of
refrigerant.
Note:
In case of construction during rainy reason, if dew
condensation occurs in the piping due to extended
construction period, or rainwater or else may enter the
piping during construction work:

Table of Contents

Related product manuals