Termix VMTD-IV MIX - 5 Series DS Fully insulated
Pre hand over check list
Description: Pos. Page OK Remark:
Connection connected correctly 10
All connections tightened
Primary system ushed, through ushing bypass
2 Strainers checked 9 17
Dierential pressure controller adjusted 31 19
Clip on actuator removed 69 19
Wiring completed 14-15
Mains connected
Room controller connected and working
Pre payment unit connected and working
Pump setting completed 10 19-20
System properly vented 48 17
UFH stat mounted correctly on heating supply line 60 21
DHW Temperature setting 74 21-22
Heating temperature setting 7 18
Flushing bypass closed
Insulation has been remounted
Date: Unit No.: Carried out by: