EasyManua.ls Logo

Danfoss iC7 Series

Danfoss iC7 Series
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1.
2.
1
2
3
4
e30bj174.10
Illustration 7: Installation of the Top Cover
1
M5x14 screws
2
Top cover
3
Top cover gasket
4
Top vent
2.6 Creating a Vent Opening in the Base Plate
To create a vent opening in the base plate for the bottom duct, use the following steps. Use the dimensions in Illustration 8 for FA09
frequency converters, and Illustration 9 for FA10 frequency converters.
Procedure
Cut out the vent opening in the cabinet base plate using the dimensions in the template.
Drill 6 screw holes (4 mm) around the vent opening using the dimensions in the template.
The holes must match the holes in the lower flange of the bottom duct.
AN371942757356en-000101 / 136R025210 | Danfoss A/S © 2022.03
Installation
In-bottom/Out-back Cooling Kit for FA09-FA10
Installation Guide

Other manuals for Danfoss iC7 Series

Related product manuals