Termix VVX-IV - 7 Series DS Fully insulated
Lifting instructions
Temporarily remove the inspection hatch.
Temporarily remove the service hatch.
Lift the HIU in the following two places:
1. On the left hand side around the DHR pipe.
2. On the right hand side around the pipe below T-piece attached to the
heat exchanger.
Now, hang the HIU onto bolts in the wall.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Danfoss Termix VVX-IV 7 Series and is the answer not in the manual?

Danfoss Termix VVX-IV 7 Series Specifications

General IconGeneral
BrandDanfoss
ModelTermix VVX-IV 7 Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals