EasyManua.ls Logo

Dantel 46210 - Page 50

Default Icon
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PAGE 50 46210/46220-0998 <90-00036>
Points are operated for the time periods set by switch S3 or by
programming (see OPTION and CPM POINT TIME PERIOD
commands).
Input Example:
>CPM 2 SET 1,3,5
Output Response:
>CPM 2 POINT 1 OPERATE
CPM 2 POINT 3 OPERATE
CPM 2 POINT 5 OPERATE
This example would operate control points 17, 19 and 21 (points
1, 3, and 5 of subgroup 2.
CPM POINT TIME PERIOD
Purpose:
Sets the time period for momentary operation of control points.
Format:
CPM # LONG time
CPM # SHORT time
CPM # PERIOD point number time
Remarks:
# can be a range of subgroups from 1 through 4 or the word ALL.
Here are examples:
CPM 4 Control subgroup 4 (control points 49-64)
CPM -3 Control subgroups 1-3 (control points 1-48)
CPM 2- Control subgroups 2-4
CPM 2-3 Control subgroups 2-3
CPM ALL All control subgroups
List point numbers individually with a comma between them, or
as a group with a hyphen between them, or use the word ALL;
range can be from 1 through 16.
Time is in tenths of seconds from 0.1 seconds to 25.5 seconds. To
specify the time, use a number from 1 through 255, each number
representing a tenth of a second.
CONTINUED . . .
PRINTER SYNTAX

Related product manuals