EasyManua.ls Logo

DekPro PRESTIGE - Post Placement & Installation; Post Mounting Options

Default Icon
6 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DekPro™ Presge Aluminum Rail System
Level Railing Installaon Instrucons
Post Placement & Installaon
3" Post
3/8" Diameter Lag
Deck Board
Wood Blocking
3" Post
3/8" diameter Carriage
Deck Board
Wood Blocking
Post Mounng Opons
3.75
MIN.
3-1/2" min.
3" Post
27.6 MPa (4000 psi) MIN.
Concrete
3/8" diameter X 3"
long 'Redhead' Trubolt
Surface Mount using Carriage Bolt
Surface Mount using Lag Bolt
Surface Mount using Concrete Anchor
Step 1: Layout
Lay out post placement.
If stairs are involved, it may be benecial to start
with post placement at top of stair run.
Actual Railing Lengths:
• 70” for 6’ rail
• 96-3/4” for 8’ rail
Step 2: Mount Post
• Set post in place and mark four mounng holes.
• Pre-drill holes for mounng hardware, then fasten post with mounng
hardware (not included). See below for mounng opons.
• Check that post is plumb and shim if necessary (shims included).
*Note: Oponal Quick jig can be used to plumb posts using the aached 2 way level.
For 4” sleeve - Slide sleeve over exisng wood 4x4
and furr-out as necessary.
Mark and
Pre-drill Holes
Fasten Post to
Deck Surface
WWW.DEKPROMFG.COM
Level Rail
Page 2
WWW.DEKPROMFG.COM