Guidelines for installing and connecting management network
cables
Use the following illustration as reference for console and management ports on the switches.
Figure 20 Console and management ports on switches
Note: As cables are installed and connected, dress and tie cables frequently so
that excess slack does not interfere with routing of adjacent cables.
Refer to the management network cable diagrams applicable to your installation:
l
Management network A, nodes 1 - 16 Management network A, nodes 1 - 16
cabling on page 45
l
Management network B, nodes 17 - 22 Management network A, nodes 17 - 22
cabling on page 46.
l
Management network B, nodes 23 - 32 Management network B, nodes 23 - 32
cabling on page 47.
Install Management Network I/O Cables
44 Dell EMC VxFlex Ready Node Server Installation Guide