8 Tower-to-Rack Conversion Guide
Figure 1-1. Tower-To-Rack Kit Contents
Recommended Tools and Supplies
• #2 Phillips screwdriver
• 3/8-inch or 10-mm nut driver
• T-10 Torx driver (for removing and installing the front panels)
Conversion Tasks
Installing a rack kit involves performing the following tasks:
• Removing the bezel
• Removing the cover, chassis panels, and stabilizer feet
• Removing the optional 1x2 flex bay bracket
• Removing the control panel assembly
• Removing the tower front plate
• Installing the rack front plate and rack ears
• Installing the control panel assembly and metal filler panel
1 chassis metal filler panel 2 chassis plastic filler panel (3) 3 left rack ear
4 rack front plate 5 right rack ear 6 rack bezel
7 M3 x 8 flathead Torx screw
(34)
8 6-32 x 0.188 flathead Phillips
screw (8)
9 10-32 shoulder nut (6)
10 replacement control panel
display label
4
3
9
6
5
8
1
2
7
10
book.book Page 8 Friday, May 26, 2006 3:03 PM