EasyManua.ls Logo

Dell PowerEdge 2950 - LCD Status Messages

Dell PowerEdge 2950
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rack Installation Guide 17
4
Pull the system out of the rack until it stops because of the safety catch.
5
Pull up on the front release latch on each rail to disengage the safety catch (see Figure 1-7) and slide
the system forward.
6
Pull the system completely out of the rack.
Installing the Cable-Management Arm
NOTE: You can attach the
cable-management arm to either side of the rack cabinet.
NOTE: Attach the
cable-management arm ramp assembly to the side opposite of where you attach the cable-
management arm.
1
Fit the latch on the front end of the cable-management arm onto the bracket on the end of the
mounting rail until the latch clicks (see Figure 1-8).
2
Fit the latch on the unattached end of the cable-management arm onto the bracket on the end of the
slide assembly until the latch clicks (see Figure 1-8).
CAUTION: Both ends of the cable-management arm must be connected before you begin routing the system
cables
.
Figure 1-8. Installing the Cable-Management Arm
1 mounting rails (2) 2 brackets (2)
3 latches (2) 4 cable-management arm
back of system
1
2
4
3

Table of Contents

Other manuals for Dell PowerEdge 2950

Related product manuals