Getting Started With Your System 1
Installation and Configuration
WARNING: Before performing the following procedure, review the safety
instructions that came with all Storage Center components.
WARNING: Battery pack MUST be removed before the controller is
removed from the enclosure.
WARNING: Installing an incompatible battery on the server board may
increase the risk of fire or explosion. Observe the following precautions:
•
The battery should only be replaced with a battery that is the same or
equivalent as the factory installed battery.
•
Do not attempt to open or service the battery. Do not dispose of the
battery in a fire or with household waste. Contact the local waste
disposal agency for the location of the nearest battery deposit site.
Laser Safety statement
The unit is certified in the U.S. to conform to the requirements of DHHS
21 CFR, chapter 1 Subchapter J for Class I (1) laser products, and
elsewhere is certified as a Class I laser product conforming to the
requirements of IEC 60825-1:2007.
Class I laser products are not considered to be hazardous. The laser
system and unit are designed so there is never any human access to
laser radiation above a Class I level during normal operation, user
maintenance or prescribed service condition.
Unpacking the System
NOTE: Unpacking, installing, and deploying your Storage Center may be
done only by a certified service technician.
CAUTION: Class I laser radiation when open, avoid
exposure to the beam.
DANGER: Laser radiation, avoid direct exposure to beam.