EasyManua.ls Logo

Dell Vostro 5625 - Installing the I;O Board

Dell Vostro 5625
75 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the I/O board
Prerequisites
If you are replacing a component, remove the existing component before performing the installation process.
About this task
NOTE:
A RJ-45 Network Port assembly for the I/O board is required.
If you are replacing the I/O board, transfer the existing RJ-45 Network Port assembly to the replacement I/O board.
The following image(s) indicate the location of the I/O board and provides a visual representation of the installation procedure.
42 Removing and installing components

Table of Contents

Other manuals for Dell Vostro 5625

Related product manuals