Chapter 7 Optional AccessoriesC2000-HS
7-24
3. Install the conduit box by fasten the 5 screws shown in the following figure.
Screw torque:
24–26 kg-cm / [20.8–22.6 Ib-in.] / [2.4–2.5 Nm]
4. Fasten the 2 screws shown in the following figure. Screw torque: 12–15 kg-cm / [10.4–13 Ib-in.] / [1.2–1.5 Nm]
Frame E
1. Loosen the 4 cover screws and lift the cover;
Screw torque: 12–15 kg-cm / [10.4–13 Ib-in.] / [1.2–1.5 Nm]