Chapter 6. Suggestions and Error Corrections for Hybrid Servo DrivesC | VFD-VJ   
 
6-4
Transformer and reactor of main circuit 
Check Items  Methods and Criterion 
Maintenance 
Period 
Daily 
Half 
Year 
One 
Year 
If there is any abnormal vibration or peculiar 
smell 
Visual, aural inspection and 
smell 
○ 
 
 
Magnetic contactor and relay of main circuit 
Check Items  Methods and Criterion 
Maintenance 
Period 
Daily 
Half 
Year 
One 
Year 
If there are any loose screws  Visual and aural inspection 
○ 
 
 
If the contact works correctly  Visual inspection 
○ 
 
 
Printed circuit board and connector of main circuit 
Check Items  Methods and Criterion 
Maintenance 
Period 
Daily 
Half 
Year 
One 
Year 
If there are any loose screws and connectors 
Tighten the screws and 
press the connectors firmly 
in place. 
 
○ 
 
If there is any peculiar smell and color change  Visual and smell inspection 
 
○ 
 
If there is any crack, damage, deformation or 
corrosion 
Visual inspection 
 
○ 
 
If there is any liquid is leaked or deformation in 
capacity 
Visual inspection 
 
○ 
 
Cooling fan of cooling system 
Check Items  Methods and Criterion 
Maintenance 
Period 
Daily 
Half 
Year 
One 
Year 
If there is any abnormal sound or vibration 
Visual, aural inspection and 
turn the fan with hand (turn 
off the power before 
operation) to see if it rotates 
smoothly 
 
○ 
 
If there is any loose screw  Tighten the screw 
 
○ 
 
If there is any color change due to overheat  Change fan 
 
○