© 02/2010 OBJ_DOKU-21747-001.fm
1/6
6
Front cover
TCD 2013 2V W 01-03-01
Removing and installing the front cover
(opposite side to flywheel)
Standard tools:
– Feeler gauges
– Locking agent
DEUTZ DW 72
– W 01-02-01
– W 05-01-01
– W 16-01-01
Remove the front cover
● Remove V-belt pulley.
W 05-01-01
● Unscrew screws (1).
● Remove clamping strap (2) and fuel supply pump.
● Unhook the fuel supply pump at the side.
● Unscrew screws (1).
● Remove holder with impulse transmitter (2).
● Remove oil suction pipe
W 16-01-01