EasyManua.ls Logo

Deutz TCD 2013 2V - Page 76

Deutz TCD 2013 2V
471 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© 02/2010 OBJ_DOKU-21749-001.fm
1/4
6
Crankcase
TCD 2013 2V W 01-07-03
Removing and installing the pressure holding valve
Standard tools
Special tools:
Slide hammer 150800
Locking agent
DEUTZ DW 71
W 16-01-01
Collect leaking operating substances in
suitable vessels and dispose of according
to regulations.
Removing the pressure holding valve
Remove oil suction pipe
W 16-01-01
Pull out oil dipstick.
Drill out hole with a 6.7 mm Ø drill.
Make sure no chips get into the crankcase.
Coat spiral drill thickly with grease, so that
no drill shavings fall into the crankcase.
© 44570-0
Cut thread M8 x 1.25.
© 44571-0

Related product manuals