EasyManua.ls Logo

Dickey-John GAC500XT - Installation and Setup; Shipping Screw Removal; Unit Positioning

Dickey-John GAC500XT
39 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATOR’S MANUAL
INSTALLATION AND SETUP
Before shipping, the GAC500XT is tested and inspected to ensure the unit
is fully operational and meets all measurement specifications. After
unpacking, inspect for damage that may have occurred during transit. Save
all packing material until inspection is complete. If damage is found,
immediately file a claim with the carrier. Also notify your DICKEY-john Sales
Representative.
NOTE: Before relocating or
shipping the GAC500XT,
the shipping screws must
be replaced.
REMOVING SHIPPING SCREWS
Once the GAC500XT is placed in a level location, remove the shipping
screws.
Make sure shipping screws are removed prior to operating the
GAC500XT. Failure to do so may permanently damage the unit.
Figure 2
Removing Shipping Screws
GAC50
0XT
TM
Shipping
Screws
UNIT POSITIONING
To achieve the most precise measurements, select a location that is clean,
level, and protected from rapid changes in temperature. Level installation
helps to ensure weight measurement that correlates with the GAC2100.
GAC500XT
11001-1352-200510
INSTALLATION AND SETUP 5

Related product manuals