OPERATOR’S MANUAL with Maintenance Information
Maintenance
57
11 Turn the key switch to platform control.
And start the engine from platform controls
12 Test all machine functions from the
platform controls.
⊙ Result: All platform control functions should
operate.
C-2
Perform Engine Maintenance
Engine specifications require that this
procedure be performed every 500 hours or
semi-annually, whichever comes first.
Required maintenance procedures and
additional engine information is available in the
engine operator’s manual.