EasyManua.ls Logo

Ditch Witch FM25 - Planning; Setting up at Jobsite

Ditch Witch FM25
73 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Overview - 28 FM25/FM25X Operator’s Manual
Planning
Planning
1. Gather information about jobsite (page 32).
2. Inspect jobsite (page 33).
3. Check supplies and prepare equipment (page 34).
Setting Up at Jobsite
1. Prepare jobsite (page 33).
2. Position fluid unit and connect to drilling unit. See drilling unit operator’s manual.
3. Block trailer wheels.
IMPORTANT: Leave unit hitched to towing vehicle or properly stabilized.