EasyManuals Logo

Ditch Witch FM25 User Manual

Ditch Witch FM25
73 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #33 background imageLoading...
Page #33 background image
Prepare - 32 FM25/FM25X Operator’s Manual
Gather Information
Gather Information
A successful job begins before the excavation. The first step in planning is reviewing information already
available about the job and jobsite.
Arrange for Traffic Control
If working near a road or other traffic area, contact local authorities about safety procedures and
regulations.
Prepare for Working Near Existing Utilities
If jobsite may contain electrical lines, wear protective boots and gloves meeting the following standards:
Boots must have high tops and meet the electric hazard protection requirements of ANSI Z-41, 1991,
when tested at 18,000 volts. Tuck legs of pants completely inside boots.
Gloves must have 17,000 AC maximum use voltage, according to ASTM specification D120-87.
If working around higher voltage, use gloves and boots with appropriately higher ratings.
Plan for Emergency Services
Have the telephone numbers for local emergency and medical facilities on hand. Check that you will have
access to a telephone.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ditch Witch FM25 and is the answer not in the manual?

Ditch Witch FM25 Specifications

General IconGeneral
BrandDitch Witch
ModelFM25
CategoryDrill
LanguageEnglish