12. Loosen the nut to remove preload torque.
13. Hand tighten the nut and back it off 1/4 to 3/4 of a turn.
14. Place tang washer on spindle and bend one tang inward over
the nut. This will keep the inner nut from turning while torque
is applied to the outer nut.
15. Install the outer nut and torque to 225-250 ft•lb (305-309
N•m). Ensure that inner nut does not turn. Bend two tangs
from the tang washer over the outer flats to secure.
16. Install cap with o-ring and plug installed. Rotate the hub and
check bearing adjustment. Allowable end play is .001 in-.010
in (.025-.25 mm).
12. Loosen the nut to remove preload torque.
13. Hand tighten the nut and back it off 1/4 to 3/4 of a turn.
14. Place tang washer on spindle and bend one tang inward over
the nut. This will keep the inner nut from turning while torque
is applied to the outer nut.
15. Install the outer nut and torque to 225-250 ft•lb (305-309
N•m). Ensure that inner nut does not turn. Bend two tangs
from the tang washer over the outer flats to secure.
16. Install cap with o-ring and plug installed. Rotate the hub and
check bearing adjustment. Allowable end play is .001 in-.010
in (.025-.25 mm).