JT1220 Mach 1 Operator’s Manual Contents - 7
CMW
Contents
Overview
machine serial number, information about the type of work this machine is designed
to perform, basic machine components, and how to use this manual
1
Foreword
part number, revision level, and publication date of this manual, and factory contact
information
5
Safety
machine safety alerts and emergency procedures
9
Controls
machine controls, gauges, and indicators and how to use them
19
Operation Overview
an overview for completing a job with this machine: planning, setting up, installing
product, and restoring the jobsite; with cross references to detailed procedures
55
Prepare
procedures for inspecting and classifying the jobsite, planning the installation path,
and preparing the jobsite for work
59
Drive
procedures for startup, cold start, driving, and shutdown
75
Transport
procedures for lifting, hauling, and towing
77
Conduct a Bore
procedures for drilling and backreaming
87
Systems and Equipment
downhole tools and drill pipe, anchor, electric strike, tracker control, and fluid
systems
107
Complete the Job
procedures for restoring the jobsite and rinsing and storing equipment
147
Service
service intervals and instructions for this machine including lubrication, replacement
of wear items, and basic maintenance
153

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ditch Witch JT1220 Mach 1 and is the answer not in the manual?

Ditch Witch JT1220 Mach 1 Specifications

General IconGeneral
BrandDitch Witch
ModelJT1220 Mach 1
CategoryConstruction Equipment
LanguageEnglish

Related product manuals