EasyManua.ls Logo

Ditch Witch JT1220 Mach 1 - Start System; Prime Drilling Fluid Pump

Ditch Witch JT1220 Mach 1
150 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JT1220 Mach 1 Operator’s Manual Conduct a Bore - 89
Position Equipment
CMW
Position Equipment
1. Review bore plan and select drilling unit position and fluid unit position. See “Select Start and End
Points” on page 63.
2. Move equipment into selected positions.
Connect Fluid System
1. Connect fluid hose from mixing system to drilling
fluid pump. A 1.5” (38 mm) or larger, non-collapsible
hose is required.
2. Install y-strainer between mixing unit and drilling
fluid pump. Position strainer so that drilling fluid
flows in the direction of the arrow. In most cases,
positioning strainer at outlet of mixing unit gives
best results.
IMPORTANT: Clean y-strainer regularly. See
page 166.

Table of Contents

Related product manuals