INSTALLATION
A. Installing The Furnace Using A Standard Door Option
STEP1
Sealant
(Or Butyl Tape)
Bezel
The standard door option requires that the rectangular
hole cut into the wall for the door opening has sharply cut
corners to match the Furnace. The Furnace must be able to
slide freely through the opening.
• Place the Furnace through the cutout approximately 1"–2"
from the wall.
• Apply RTV sealant or butyl tape to the entire back flange of
the bezel.
STEP2
RV Wall
Bezel
• Place the bezel over the tabs and flush with the front edge
of the casing. Be sure the edge of the bezel marked "TOP"
faces the top of the casing. Bend the casing tabs over the
bezel.
• Push the Furnace and bezel against the side wall. Secure
using six #6 or #8-18 Pan Head Type A screws (not
provided) placed through the bent tabs, bezel, and into
the RV wall.
• Place six more screws (three per side) to the le and right
side of the bezel. The bezel MUST fit tightly against the
wall. Remove excess sealant.
Do NOT deform the bezel during placement. The bezel
must fit tightly to maintain an airtight seal.
STEP3
Gas
Connection
Electrical Connection
• Connect the electrical wiring. Refer to “H. Connecting The
Electrical” on page 22.
• Connect the gas line to the valve. Refer to “F. Connecting
The Gas” on page 20.
STEP4
RV Wall
Mounting
Bracket
Door
Vent
Assembly
Bezel
• Align the door with the bezel.
• Secure the door with four #6-19x1/2" thread-forming
screws for plastic (not provided), or with a screw that
engages the RV wall and that is longer than 1/2".
• Place the screws through the door into the bezel bosses.
• Insert the vent assembly (provided) through the hole in
the door, making sure the vent assembly goes into the
chamber tube. Make sure the vent assembly is aligned with
the Dometic text at the TOP.
• Secure the vent assembly to the door using four stainless
steel exhaust screws (provided with the door).
• To secure the Furnace to the floor of the RV, proceed to
“D. Installing The Mounting Brackets” on page 19.