12 Installation
2.5. Initial Setup
Because the signal and monitoring electronics are entirely digital, no
calibration or adjustments are necessary. To verify operation, apply a tone
(in the AES/EBU digital format) to the DLM’s input. The meter should
indicate precisely the level of the signal.
If you do not see an indication on the DLM, perform the following:
• recheck your connections on the Euroconnector
• ensure the Euroconnector is properly seated unto the DLM
• verify DC power is present
• verify a digitally encoded tone is present and is at a level within the
range of the DLM’s scale.