476 Issue date: 17 November 2006 78 of 80
Document history
Assessments
An equality, sustainability or health, safety and welfare impact assessment and/or a risk assessment was
last completed on:
Audit trail
Listed below is a brief audit trail, detailing amendments made to this policy/procedure.
Brief description of change
Policy rewritten as the old BA sets have been replaced by Dräger
PSS 7000 sets. Please read through this policy to familiarise
yourself with the content.
Introduction of annual test date on Bodyguard and insertion
sections regarding the cylinder cover fitting and removal. Whole
policy updated to reflect this.
Removal of details of BA Personal line testing, addition of referral
to PN471.
“28 day test removal of Bodyguard key” added and “static leak test
8 second duration” and “Bodyguard timeout” updated.
Incorporation of PN 479 EDBA and telemetry. Removal of Don
and start (now contained in PN 466 RPE – Operational
Procedures).
Appendix added contains BA set and stowage fault codes.
Image 250375 replaced with image 400969. Reference to 250375
updated.
Insertion of information regarding 28 day face mask testing.
Road traffic accidents/RTAs updated to road traffic
collisions/RTCs as requested by Andy Roe.
‘A’ and ‘B’ tests updated to reflect issue of BA cable cutter and
pouch.
‘A’ test updated to reflect not checking hydraulic test date.
References to not cleaning face mask visor removed following
PEG replacement of all face mask visors with cleanable version.
Paragraph 14.46 paragraph added to cylinder removal SDBA
section.
Appendix 9 added.
Paragraph 15.20 paragraph added to cylinder removal EDBA
section.
Appendix 10 added.
Appendix 2 removed and following appendices renumbered.
Minor updates throughout. Reviewed as current.