Why is the timer not working on my Dräger Testor 2100 Test Equipment?
- JJasmine FarmerJul 25, 2025
If the timer isn't working, the battery might be empty. Replace the battery to resolve this issue.
Why is the timer not working on my Dräger Testor 2100 Test Equipment?
If the timer isn't working, the battery might be empty. Replace the battery to resolve this issue.
What to do if Dräger Test Equipment test pressure is not reached?
If the test pressure is not reached, it may be due to a few reasons: * The supply pressure might be too low. Check the supply pressure and fill the cylinder if needed. * The adaptor could be incorrect or leaky. Check the adaptor.
How to fix a test head that loses air on Dräger Testor 2100 Test Equipment?
If the test head is losing air: * Retighten the connector clamp, as the test head might be leaky. * Check the hose connections.
What to do if there is positive pressure in the mask of Dräger Test Equipment?
If there's positive pressure in the mask, the mouth nozzle on the test head might be leaky. Send it to Dräger for repair.
Brand | Dräger |
---|---|
Model | Testor 2100 |
Category | Test Equipment |
Language | English |
Overview of the Dräger Testor 2100 device and its components.
Overview of the Dräger Testor 3100 device and its enhancements.
Details the functions of each joystick on the test device.
Explains the meaning of the LED indicators on the Dräger Testor 3100.
Instructions on how to set the test time using the device's timer function.
Procedures for safely removing and reattaching the test head.
General guidance and remarks for preparing the test device before use.
Lists the minimum PC specifications required for installing the Adaptor II software.
Step-by-step guide for installing the Adaptor II software on a PC.
Details self-test procedures for the Dräger Testor 2100 device.
Procedure for performing a self-test on the round thread connection.
Describes the automatic zero balance function of the Dräger Testor 3100.
Steps for preparing the test device and attaching the full-face mask.
Procedure to test the opening pressure of the exhalation valve.
Method for checking leaks in the full-face mask.
Procedure for testing air-tightness with a sealed exhalation valve.
How to perform a leak test on the full-face mask underwater.
Final steps to conclude the full-face mask testing procedure.
Procedure for testing a normal pressure lung demand valve with medium pressure coupling.
Steps to test the metering valve function of the lung demand valve.
Final steps to conclude the lung demand valve testing procedure.
Steps to prepare the test device for positive pressure lung demand valve testing.
Procedure for checking leaks on positive pressure lung demand valves.
How to test switching and static positive pressure for lung demand valves.
Procedure to test the metering valve on positive pressure lung demand valves.
Final steps to conclude the positive pressure lung demand valve testing.
Steps to prepare the test device for normal pressure lung demand valves without medium coupling.
Procedure for checking leaks on normal pressure lung demand valves.
How to test the opening pressure for this type of lung demand valve.
Procedure to test the metering valve for these lung demand valves.
Final steps to conclude the testing of normal pressure lung demand valves.
Steps to prepare the test device for positive pressure lung demand valves without medium coupling.
Procedure for checking leaks on positive pressure lung demand valves.
How to test switching and static positive pressure.
Procedure to test the metering valve for these lung demand valves.
Final steps to conclude the testing of positive pressure lung demand valves.
Steps to prepare the test device for compressed air breathing apparatus testing.
Procedure to test static medium and medium pressure measurements.
How to perform a high pressure leak test on breathing apparatus.
Method for comparing manometer readings.
How to test the response threshold of the breathing apparatus warning device.
Final steps to conclude the compressed air breathing apparatus testing.
Procedure for checking leaks in a chemical protection suit.
How to test the suit valve of a chemical protection suit.
Final steps to conclude the chemical protection suit testing.
Table outlining recommended maintenance intervals for various tasks.
Instructions on how to replace the battery in the timer unit.
Technical specifications for the Dräger Testor 2100.
Technical specifications for the Dräger Testor 3100.