EasyManua.ls Logo

Dreame RLS6LADC-6 - Before Use; Initial Setup: Preparation and Installation

Dreame RLS6LADC-6
175 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
EN
Note: Install the side brush until it clicks into place.
1. Remove the protective strips 3. Connect to an Electrical Outlet
PlacethebasestationinalocationthatisasopenaspossiblewithagoodWi-Fi
signal.Insertthepowercordintothebasestationandplugitintothesocket.
4. Place the Base Station
Removeanyobjectsthatarecloserthan1.5mfromthefront,1mfromthetop,
and0.5mfromeithersideofthebasestation.
2. Install the Side Brush and the Mop Assembly
Before Use
Note:
·
Make sure that no objects might block the signaling area.
·
To prevent water stains from wetting wood floors or carpets, placing the base
station on tile floors or marble floors is recommended.
Firmly insert the power
cord upwards until the
indicator turns on.
Side Brush Clip
> 0.5 m
> 0.5 m
> 1 m
> 1.5 m
I:ON
O:OFF

Related product manuals