Target Group
Installation Environment
Tools
Max.
+50
o
C
Min.
-10
o
C
RH.
+5%~+95%
Skilled personnel
This manual and the tasks and procedures described herein are intended for use by skilled electricians
only. A skilled electrician is defined as a trained and qualified electrician or installer who has all of the
following skills and experience:
Knowledge of the functional principles and operation of on-grid systems.
Knowledge of the dangers and risks associated with installing and using electrical devices and
acceptable mitigation methods.
Knowledge of the installation of electrical devices.
Knowledge of and adherence to this manual and all safety precautions and best practices.
Please note that this is the quick reference guide only. It is a shortened assistance for the installation
of the Battery HV and does not replace the original installation manual. The original installation
manual must be read and understood completely before installation. Please download and view the
installation manuals on this website: www.Dyness.com (Downloads).
In order to ensure the normal operation of Tower, please be sure to update the firmware to the latest
version and finish the configuration on the Tower webpage in accordance with this document.
The system must be switched off before installation.
Please make sure the system is switched off in case the system is not working. It should be repaired
within one week, avoiding deep discharge and other problems happen.
Please do not stack up batteries without protective package when storing or handling batteries, unless
during installation.
Crimping
Phillips Screwdriver
Spirit level
Electric drilling
machine