1. First, set the BDU circuit breaker to “ON position.
2. Set the ON/OFF switch to “ON”, press and hold the “WAKE” button for 10s. Release the button and the green
light will stay on; the battery has been turned on successfully.
Press and hold the “WAKE” button for 10s.
Parallel connection
Dyness supports a maximum of 4
clusters and a dedicated Combiner box
(DCB-TW) must be configured.
Single cluster installation is the same as
stand-alone. For others, please consult
Dyness.
Switching the battery system on