Level
Install the shower base:
1. Take the shower base out of the carton and put it on
the floor carefully.
2. Put the Level on the shower base to check whether the base is
level. If not, use a wrench to adjust the adjusting legs
(illustrated in Drawing A.) to make sure the base is level and that
there is no rock in base.
3. recheck base level in both directions
Install the back Panels:
1. Move the base away from the walls to allow room to get behind
the shower to fasten the walls and make connections.
2. Take the No.1 Panel out of the carton and put it on the shower base
carefully. Please be sure to have one person hold the panel safely.
3. Take the No.2 Panel out and insert it into profile of the No.1 panel.
4. Use a Philips screwdriver to fasten the panels together with 4x10mm
screws. Illustrated in Drawing B.