EasyManua.ls Logo

Eaton 600 A 15 kV class - Completing T-Body Termination

Eaton 600 A 15 kV class
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Completing T-body termination
Step 12.
Install stud into apparatus bushing
Ensure the unit is de-energized.
Thread the shorter threaded end of extended stud into
the apparatus bushing until hand tight. Refer to Figure
25.
Engage the flats on the stud with a 1/2” wrench and
thread the stud into the bushing an additional
1/4 revolution past hand tight.
Remove any shavings that may have been raised during
the threading procedure.
Install BT-TAP assembly onto apparatus bushing
Step 13
Install T-body onto apparatus bushing
Clean and then lubricate mating interfaces of the appara-
tus bushing and T-body with lubricant supplied.
Push the T-body onto the apparatus bushing ensuring that
the stud on the bushing, passes through the hole of the
compression connector. See Figure 26.
Figure 26. Line illustration of BT-TAP connector installa-
tion onto apparatus bushing.
Lubricate 600 A Interfaces
T-body
Apparatus
bushing
Figure 25. Line illustration of bushing stud installation.
APPARATUS BUSHING
SHORT THREADS
INTO BUSHING
EXTENDED
STUD (STUDAL or STUDCL)
1
/
2
" CROWSFOOT
WRENCH
12
600 A 15 kV and 25 kV class BT-TAP connector system installation instructions MN650004EN May 2021
Catalog data MN650004EN
Effective May 2021
Deadbreak apparatus connectors

Other manuals for Eaton 600 A 15 kV class

Related product manuals