EasyManua.ls Logo

Eaton 600 A 15 kV class - Page 15

Eaton 600 A 15 kV class
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Install BOL-T T-body with mating parts
Step 11.
Install DT625 T-body
Clean and lubricate the outside of the cable adapter with
the lubricant supplied.
Clean and lubricate the inside of the T-body with the
lubricant supplied.
ote: N If test point T-body is used, ensure the test point
is opposte the front plate side of the T-body.
Without moving the cable adapter, slide the T-body onto
the cable adapter until the compression connector eye is
centered in 600 A interfaces. (Refer to Figure 24.)
ote: N The end of the cable adapter must line up with
the top edge of the tape marker after T-body
assembly. Refer to Figure 21.
Remove the tape marker from the cable.
Go to "Step 12." on page 12 to complete T-body ter-
mination.
Figure 24. Line illustration of BOL-T T-body installation.
T-body
Cable adapter
Tape marker
Concentric neutral wires
Lubricate
600 A Interfaces
Apparatus
bushing
Test point on
accessible
side
11
600 A 15 kV and 25 kV class BT-TAP connector system installation instructions MN650004EN May 2021
Catalog data MN650004EN
Effective May 2021
Deadbreak apparatus connectors

Other manuals for Eaton 600 A 15 kV class

Related product manuals