EasyManua.ls Logo

Eaton 600 A 15 kV class - Page 18

Eaton 600 A 15 kV class
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Step 16.
Cap the 200 A interface
Follow the installation instructions supplied with the mating
200 A product (loadbreak elbow, M.O.V.E. arrester, etc.).
Refer to Figure 29.
Step 17.
Ground system
Connect one drain wire tab of the BLRTP and T-body with
an uninsulated drain wire to a common ground point.
Refer to Figure 30.
Connect the mating 200 A product (i.e., protective
cap, grounding elbow, M.O.V.E. arrester) drain wire to
common ground.
When connecting drain wires to the common ground point,
be sure to leave adequate slack for hotstick operation.
Figure 29. Line illustration of M.O.V.E. elbow arrester
installation.
Clean
and
lubricate
T-body
BLRTP 200 A
Interface
M.O.V.E.
Elbow
arrester
Figure 30. Installation of the drain wires.
T-body
Drain
wire
14
600 A 15 kV and 25 kV class BT-TAP connector system installation instructions MN650004EN May 2021
Catalog data MN650004EN
Effective May 2021
Deadbreak apparatus connectors

Other manuals for Eaton 600 A 15 kV class

Related product manuals