Battery Upgrade Instructions for 93E (20–60 kVA) P-164000967—Rev 01 15
4. Install the appropriate new wiring labels
• 30kVA, label P/N - P-138000552
• 60kVA, label P/N - P-138000553
5. Reinstall the battery dead front panel
As you install the panel, you may feel some slight resistance. The shipping bracket on the dead front panel
is pressing on the battery harness
Reinstall slowly to ensure you are not pinching any battery cables. If you feel as though it is too much
resistance, reform the wires and reinstall the dead front panel
6. Reinstall remaining dead front panels
7. Refer to the Eaton 93E UPS Installation and Operations Manual instructions to return the UPS to normal
and supporting the load
Battery Upgrade Instructions