EasyManua.ls Logo

Eaton 9SX Series - Page 83

Eaton 9SX Series
128 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
77
Tower mount:
1. Place the EBM modular on the right side of the UPS and align with the front
panel of the UPS modular.
2. Screw the UPS’s tower foot: one is to UPS’s side, another one to EBM’s side
(as below)
Pay attention to this installation:
1. EBM modular must be installed on the right side of the UPS.
2. EBM modular contains 2 battery pack, so the right side of the UPS needs to
be reserved.
3. EBM modular is heavy and requires more than two people to install.
3.3.3 MBP(Maintenance Bypass modular) installation:
MBP modular installation steps are the same as UPS, details please see
MBP
user manual

Other manuals for Eaton 9SX Series

Related product manuals