EasyManua.ls Logo

Eco-Flo EPP33 - Sump Pump Installation Steps

Eco-Flo EPP33
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CAUTION:
Check local codes before installing
pump.
STEP 1:
Pump must be installed in a suitable
gas tight, properly vented basin which
is at least 24” deep and at least 14”
wide for pumps tted with vertical on/
o switches.
STEP 2:
Pump must be placed on a hard sur-
face in a sump that has been cleared
of all debris. Never place the pump on
clay, earth or gravel surfaces and it is
suggested the pump be placed on two
bricks approximately 2” apart.
STEP 3:
Connect the discharge pipe, ttings
and check valve to the discharge port
of the pump. It is recommended that
the discharge pipe diameter be equal
to or larger than the discharge size of
the pump.
Discharge piping can be
PVC, polypipe or
galvanized steel.
Inlet Pipe
INSTALLATION
5
For parts or assistance, call ECO-FLO Customer Service at 1-877 326-3561

Related product manuals