EasyManua.ls Logo

ECOFOREST Eco I Insert - Page 57

ECOFOREST Eco I Insert
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
56
BUFFER TANK
1 PROBE
Buffer tank temperatura.
Maximum buffer tank temperature setpoint.
Demand ends.
Minimum buffer tank temperature setpoint.
Demand starts.
2 PROBES
Upper probe tank temperature.
Lower probe tank temperature.
Set temperature in top tank probe. Demand ends.
Set temperature in lower tank probe. Demand
starts.
DHW
1 PROBE
Tank temperature.
Maximum tank temperature setpoint. Demand
ends.
Minimum tank temperature setpoint. Demand
starts.
2 PROBES
Upper probe tank temperature.
Lower probe tank temperature.
Setpoint temp. Reached in lower tank probe.
Demand starts.
Setpoint temp. Reached in lower tank probe.
Demand starts.
Performs an anti-legionella cycle
Dissipation DHW
It dissipates the heat produced during the shutdown on
the DHW.
Boiler covering demand of DHW.
Boiler covering heating demand.
T1
ºC
T1
T2
ºC
ºC
T1 ºC
T1
T2
ºC
ºC

Table of Contents

Related product manuals