1. Shut o water supply in your apartment or
kitchen and open water tap at the installation
site in order to relieve pressure in your system.
2. Install the feed adapter into your cold water
line (consult diagram on page 8). Use PTFE
tape for sealing threaded connections.
3. Screw the feed water valve into feed adapter
¼’’ female thread. Connect red tube to the
compression tting of the feed water valve
(see diagram on page 8).
4. Install the drinking water faucet (see
instruction on page 8).
5. Identify the spot where you are going to install
the lter, make two holes spaced apart as per
table on page 4. Allow for at least 100 mm (3.94’’)
elevation of the bottom of your lter above the
oor. Install screw anchors if necessary and
screw in two screws (not included).
6. Connect the exible tubes (see on page 8).
Filter installation manual
Operating conditions
Overall dimensions,
(Lx D x H), mm
inch
400*135*350
15.8*5.3*13.8
Gross weight / Net
weight (±5%), kg
pounds
5.3/5.0
11.7/11
Operating pressure, bar
psi
2-6
29-87
Temperature of feed
water, °С
F
+4...+30
+39...+86
Distance between
screw holes, mm
inch
267
10.5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ecosoft 3-STAGE and is the answer not in the manual?

Ecosoft 3-STAGE Specifications

General IconGeneral
BrandEcosoft
Model3-STAGE
CategoryWater Filtration Systems
LanguageEnglish

Related product manuals