EasyManua.ls Logo

Edge-Core ECS2100-10P

Edge-Core ECS2100-10P
8 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
– 1 –
Quick Start Guide
10/28-Port Web-Smart Pro Gigabit Ethernet Switch
ECS2100-10T/ECS2100-10P/ECS2100-10PE
ECS2100-28T/ECS2100-28P/ECS2100-28PP
The ECS2100 series switches include the following models:
ECS2100-10T— 8 10/100/1000BASE-T + 2 SFP uplink ports
ECS2100-10PE— 8 10/100/000BASE-T + 2 SFP uplink ports (4 PoE ports)
ECS2100-10P— 8 10/100/1000BASE-T + 2 SFP uplink ports (8 PoE ports)
ECS2100-28T— 24 10/100/000BASE-T + 4 SFP uplink ports
ECS2100-28P— 24 10/100/000BASE-T + 4 SFP uplink ports (24 PoE ports)
ECS2100-28PP— 24 10/100/000BASE-T + 4 SFP uplink ports (24 PoE ports)
N
OTE
:
The ECS2100 series switches are for indoor use only.
N
OTE
:
For Safety and Regulatory information, refer to the Safety and Regulatory
Information document included with the switch.
ECS2100-10PE
ECS2100-10P
ECS2100-10T
ECS2100-28P
ECS2100-28PP
ECS2100-28T
E012016-AP-R01
150200001318A
www.edge-core.com

Other manuals for Edge-Core ECS2100-10P

Question and Answer IconNeed help?

Do you have a question about the Edge-Core ECS2100-10P and is the answer not in the manual?

Edge-Core ECS2100-10P Specifications

General IconGeneral
ModelECS2100-10P
Ports10
PoE Ports8
PoE Budget130W
Switching Capacity20 Gbps
Forwarding Rate14.88 Mpps
MAC Address Table Size8K
Power SupplyInternal
Power ConsumptionMax 150W
TypeManaged Switch
Layer2
Jumbo Frame Support9K
Operating Temperature0°C to 50°C
Storage Temperature-40°C to 70°C
Humidity10% to 90% (non-condensing)

Summary

Unpack the Switch

Optional Console Cable

Details on the optional RJ-45 to DB-9 console cable for management.

Accessing Other Documentation

Information on obtaining additional guides like Installation, Web Management, and CLI Reference Guides.

Install the Switch

Rack Mounting Instructions

Steps for mounting the switch into a standard 19-inch rack using provided hardware.

Wall Mounting (ECS2100-10 PE)

Guidance for wall mounting the ECS2100-10PE model, including orientation precautions.

Ground the Switch

Connect Power

Verify Switch Operation

Make Initial Configuration Changes

Web-Based Configuration

Accessing the web interface via RJ-45 for initial switch configuration using default IP.

CLI Configuration

Connecting via the serial console port for command-line interface access with default credentials.

Connect Network Cables

Optional PoE Budget Extension

Hardware Specifications

Related product manuals