EasyManua.ls Logo

Edge-Core ECS4620-28T

Edge-Core ECS4620-28T
59 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2
| Installation Overview
Switch Installation Tasks
– 19 –
Ground the Switch and Power On
Connect a ground wire to the switch, and then use a AC power cable to connect the
switch to a AC power source..
Go to the chapter “Power and Grounding.
Figure 4: Connecting AC Power
Connect DC Power
Connect a ground wire to the switch, and then use a DC power cable to connect the
switch to a DC power source.
Go to the chapter “Power and Grounding.
Figure 5: Connecting DC Power
Task 3
Connect a grounding wire to the grounding terminal..
Connect an external AC power source to the AC power socket of the switch using the supplied
AC power cord.
Connect a grounding wire to the grounding terminal..
Connect an external DC power source to the DC power socket of the switch using a DC power
cable.
1
2
1
2
1
2
1
2

Table of Contents

Other manuals for Edge-Core ECS4620-28T

Related product manuals