EasyManua.ls Logo

Edwards EDS 065

Edwards EDS 065
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6996 0223 96 Issue A
© Edwards Limited 2016. All rights reserved. Page 48
Edwards and the Edwards logo are trademarks of Edwards Limited.
Fuse size: the recommended maximum fuse size divided by √3 on each cable.
Size of the PE cable:
For supply cables up to 35 mm²: same size as supply cables
For supply cables larger than 35 mm²: half the size of the supply wires
Always check the voltage drop over the cable (less than 5 % of the nominal voltage is recommended).
Example: Itot = 89 A, maximum ambient temperature is 45 °C, recommended fuse = 100 A
Single supply cables (3 phases + PE - configuration (1)):
I = 89 A + 10 % = 89 x 1.1 = 97.9 A
The table for B2 and ambient temperature = 45 ° C allows a maximum current of 93 A for a 50
mm²cable. For a cable of 70 mm², the maximum allowed current is 118 A, which is sufficient.
Therefore, use a 3 x 70 mm² + 35 mm² cable.
If method C is used, 50 mm² is sufficient. (35 mm² for method F) => cable 3 x 50 mm² + 25 mm².
Parallel supply cable (2 x 3 phases + PE - configuration (2)):
I = (89 A + 10 %)/2 = (89 x 1.1)/2 = 49 A
For a cable of 25 mm², B2 at 45 °C, the maximum current is 63 A x 0.8 = 50.4 A. So 2 parallel
cables of 3 x 25 mm² + 25 mm² are sufficient.
Install 50 A fuses on each cable instead of 100 A.
Cable sizing according UL/cUL
Calculation method according UL 508A, table 28.1 column 5: allowable ampacities of insulated copper
conductors (75 °C (167 °F)).
Maximum allowed current in function of the wire size
AWG or kcmil
Maximum current
10
< 30 A
8
< 50 A
6
< 65 A
4
< 85 A
3
< 100 A
2
< 115 A
1
< 130 A
1/0
< 150 A
2/0
< 175 A
3/0
< 200 A
Calculation method for UL:
Single supply cables (3 phases + 1 PE - configuration (1)):
Add 25 % to the total current from the tables (see UL 508A 28.3.2: "Capacity shall have 125 % of
the full load current")
Install the prescribed maximum fuse on each cable
Parallel supply cable (2 x 3 phases + 2 PE - configuration (2)):
Add 25 % to the total current from the tables and divide by 2
Multiply the capacity of the cables with 0.8 (see UL 508A table 28.1 continued)
Install fuses of half the size of the recommended maximum fuse size on each cable.
When using 2 x 3 phase + 2 PE as in (3):
Add 25 % to the total current from the tables and divide by √3
Multiply the capacity of the cables with 0.8 (see UL 508A table 28.1 continued)
Fuse size: the recommended maximum fuse size divided by √3 on each cable.
Size PE cable:

Table of Contents

Related product manuals