EasyManua.ls Logo

eeese Alba - Before Operation; Setup and Placement; Exhaust Pipe Installation

eeese Alba
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MV-2520-01-2020
.
eeese-aircare.com © All rights reserved by Eeese Air Care APS
63
DK
3. Before operation
Place Alba in an upright position on a stable, level surface.
Ensure that the dehumidier is at a safe distance and at least 50 cm from the walls
and furniture.
Note that the voltage supplying the unit must conform to the unit's value and the
socket must be grounded.
Turn on the power and start the machine according to the instructions below.
Mounting the exhaust pipe
When using the cooling function, make sure to attach the exhaust pipe to the unit.
Screw the three parts together A B and C. Note that the ends of the tube (A) must be
stretched out in order to screw it rmly to the thread of B and C.
A B C
D

Related product manuals