EasyManua.ls Logo

EFT E410P - Motor installation

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EFT agriculture frame installation manual
© 2020 Hefei EFT all rights reserved
10
Motor installation
5.Fix the tank.
Pic 2
Pic 4
Pic 3
1. X8motor sets
2. The power plug is XT60 male, and the power
distribution board is XT60 female. Pay attention
to distinguish the positive and negative poles.
3. Prepare to install the tank, the position of
the LED lampshade on the frame is the
default tail, and the tail of the tank is in the
same direction as the tail.
4. Use M6*45 tank fixing screws and
L-wrench to fix the tank.
Pic 5
6. The finished tank is installed.
Pic 6
Pic 1

Related product manuals