56
安装咖啡机
Installing the coee machine
Erroneous installation can cause damage to people, animals and things
错误安装可能对人和动物等造成伤害
2
Balance unevenness with screw-in foot
使用拧入式支脚找平
1
Put machine on a level and stable surface
将咖啡机放在稳定的水平面上
Ensure minimum clearance of 4 cm to walls
确保与墙壁的最小间距为 4 cm
4
Attach outlet tube to machine
将出口软管连接到咖啡机上
Make tight connections
进行紧密连接
5
Connect drain tube to sink
将排水软管连接到水槽
Ensure inclination to drain
确保倾斜,以便于排放
6
Check tightness
检查是否紧固
Check all connections
检查所有连接
Check protective earth (yellow / green cable) for conductivity
检查保护地线(黄色 / 绿色电缆)是否导电
Press drip tray well
将滴水护套按压到位
8
Attach drip grid and tray
连接滴水隔栅和滴水护套
3
Connect fresh water tube
连接清水软管
Never crimp tube
不要弯曲软管
ø G
3
/
8
0.1 - 0.6 MPa
7
Connect to mains
连接电源
15 - 87 PSI