EKO INSTRUMENTS CO., LTD. I-V Curve Checker MP-11 Instruction Manual Ver.7
Analyzing and Managing
MP-11 Main Unit Measurement Data on PC
Managing the measured data on PC
Using the measured data on another application
A. MP-11 Main Unit
B. Battery Receptacle Box or
AC Adapter (1.8m)
C. USB Cable (2m)
D. PC Installed with MP-11
Software
Connect MP-11 Main Unit to PC with USB cable.
Turn the MP-11 Main Unit power ON。
Turn ON the PC and startup the MP-11 I-V Checker Software
Setup the communication port between the MP-11 Main Unit and the PC
Setup the folder for loading the data.
Start downloading the measured data
After the data loading is completed, select whether to delete the measurement data
from the Main Unit
Display and analyze the measured data.
Exit the MP-11 I-V Checker Software.
Turn the MP-11 Main Unit power OFF.
Disconnect the MP-11 Main Unit from the PC.