EKO INSTRUMENTS CO., LTD. I-V Curve Checker MP-11 Instruction Manual Ver.7
Using the Measurement Data
from PC on MP-11 Main Unit
Comparing the measured data at the site against the past measured data.
A. MP-11 Main Unit
B. Battery Receptacle Box or
AC Adapter (1.8m)
C. USB Cable (2m)
D. PC Installed with MP-11
Software
Connect MP-11 Main Unit to PC with USB cable.
Turn the MP-11 Main Unit power ON。
Turn ON the PC and startup the MP-11 I-V Checker Software
Setup the communication port between the MP-11 Main Unit and the PC
Upload the measurement data to the MP-11 Main Unit.
Verify the uploaded data on the MP-11 Main Unit
Exit the MP-11 I-V Checker Software.
Turn the MP-11 Main Unit power OFF.
Disconnect the MP-11 Main Unit from the PC.