EasyManua.ls Logo

Electrolux PLMV169DCE - Monitor Switch Test

Electrolux PLMV169DCE
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
GLMV169DBD
GLMV169DQD
GLMV169DSD
PLMV169DCE
1. Disconnect the power supply cord, and then remove outer case.
2. Open the door and block it open.
3. Discharge high voltage capacitor.
4. Before performing this test, make sure that the secondary interlock switch and the primary interlock
relay are operating properly, according to the above Switch Test Procedure. Disconnect the wire
lead from the monitor switch (COM) terminal. Check the monitor switch operation by using the
ohmmeter as follows. When the door is open, the meter should indicate a closed circuit. When the
monitor switch actuator is pushed by a screw driver through the lower latch hole on the front plate of
the oven cavity with the door opened (in this condition the plunger of the monitor switch is pushed in),
the meter should indicate an open circuit. If improper operation is indicated, the switch may be
defective. After testing the monitor switch, reconnect the wire lead to the monitor switch (COM) terminal
and check the continuity of the monitor circuit.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
of the oven cavity with the door opened (in this condition the plunger of the monitor switch is pushed in),
the meter should indicate an open circuit. If improper operation is indicated, the switch may be
defective. After testing the monitor switch, reconnect the wire lead to the monitor switch (COM)
terminal and check the continuity of the monitor circuit.
5. Reconnect all leads removed from components during testing.
6. Reinstall the outer case (cabinet).
7. Reconnect the power supply cord after the outer case is installed.
8. Run the oven and check all functions.
H MONITOR SWITCH TEST
TEST PROCEDURES
PROCEDURE
LETTER
COMPONENT TEST
Primary
Interlock
Switch
Monitor
Switch
Screw Driver
Ohmmeter
Black
White
/White

Related product manuals