55
Element4 Gas Fireplaces EuropeanHome.com
APPENDIX THREE
LP (PROPANE) CONVERSION
APPLICABLE MODELS
Bidore 100H, Modore 100H, Trisore 100H Sky, Sky T,
360, Lucius 70, Tenore 70
CONTENTS
This LP conversion kit contains these instructions plus the
following:
• one Pilot Orice (stamped 27)
• two Main Burner Orices (stamped 220)
TOOLS REQUIRED
Converting your replace to LP gas requires the following tools:
- a 7 mm box/open end wrench
- a 10 mm box/open end wrench
- a 13 mm box/open end wrench
- a 17 mm box/open end wrench
- a No. 2 Phillips screwdriver
- a pair of small needle nose pliers
- a bright work light
INSTALLATION
These models have a double burner and, therefore, two main
burner orices must be replaced.
Step 1: Remove the longest glass panel and carefully store it.
Step 2: Remove all of the re media.
Step 3: Remove hearth (bottom) panel by lifting it up and out.
Figure 1 shows panel removed.
Step 4: Remove the bolts keeping the burner base attached to
the rebox.
WARNING!
This conversion must be done by a licensed
plumber or gastter.
Turn o the gas supply before proceeding.
Begin by reading all instructions thoroughly.
Figure 1.
Figure 3.
Orice Locknut
Step 5: Loosen the top two shutter bolts (7 mm) holding each
of the two shutters in place, remove the shutters and tighten
the bolts.
Step 6: Remove the compression nuts (17 mm) from each of
the orices and, taking care to not deform the supply tube,
slide the supply tube out of the orice.
Step 7: Loosen the orice locknut (Figure 3, 13 mm) and un-
screw the NG burner orice from each of the burners
Step 8: Screw an LP orice into each burner until the orice is
aligned with the supply tube. See Figure 3.
Step 9: Connect the supply tube to each of the burner orices
and tighten the compression nuts.
Orices and Shutters
Compression Nut
Figure 2.
Burner Orice
Supply Tube
Shutter
Shutter Bolts