EasyManua.ls Logo

Elite CC - Installation; Machine Placement

Elite CC
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Joan Oró, 27 Pol. Ind. Sesrovires- St. Esteve Sesrovires, BCN, España– +34 932 935 178 – ! info@elite.es
WARNING: The machine must not be used under any circumstances by unqualified or
unauthorized personnel.
5.INSTALLATION
5.1.Machine placement
Before any work make sure that the machine is well aligned and does not oscillate at any of its
ends, in which case it must be wedged to avoid movements. For its correct level it is necessary
to use a leveling tool. This check must be carried out both longitudinally and transversally.
Poorly leveling the machine can cause unwanted vibrations and premature wear of the linear
guides.
Remember: before connecting the machine, remove any protection that the machine may have
to protect the components during transport.