EasyManua.ls Logo

Emerson COPELAND ZX Series User Manual

Emerson COPELAND ZX Series
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
ZX Condensing Unit
User Manual
ZX Condensing Unit
User Manual
Question and Answer IconNeed help?

Do you have a question about the Emerson COPELAND ZX Series and is the answer not in the manual?

Emerson COPELAND ZX Series Specifications

General IconGeneral
BrandEmerson
ModelCOPELAND ZX Series
CategoryHeat Pump
LanguageEnglish

Summary

Product Specifications and CoreSense

Qualified Refrigerants and Oils

Lists compatible refrigerants and oils for ZX platform condensing units.

CoreSense™ Controller LED Indicators

Explains the meaning of various LED indicators on the CoreSense controller.

CoreSense™ Controller Interface Navigation

Keyboard Operation and Display

Details single and combined button operations, and controller start-up display sequence.

Controller Parameter Settings and Modification

ZXD Unit Setting Point Modification

Steps to modify setting points for ZXD unit parameters.

Adjusting Condensing Temperature Set-point

Guide to adjust the condensing temperature set-point via controller settings.

Pr1 Parameter Browse and Modification

Procedure for browsing and modifying Pr1 parameters at the first level.

Installation: Handling and Weight

Condensing Unit Handling and Storage

Instructions for safe handling, transport, and storage of the condensing unit.

Location and Fixing Requirements

Unit Installation Location and Clearances

Recommendations for unit placement, clearances, and mounting considerations.

Refrigeration Piping Installation

General Piping Guidelines

Best practices for refrigerant piping installation, sizing, and support.

Thermal Expansion Valve Selection Guide

Selection at 30K Subcooling

Specific thermal expansion valve selections based on 30K subcooling.

Electrical Connections and Wiring

Start-Up Procedures and System Checks

Leak Check Procedure

Steps for performing a leak test on the refrigeration system after installation.

System Evacuation and Triple Evacuation Process

Guide to system evacuation, including the recommended triple evacuation process.

Refrigerant Charging and Operation

Refrigerant Charging Procedure

Step-by-step guide for charging the system with refrigerant, including notes on orientation and measurement.

Refrigerant Selection and Conversion

Controller Parameter Adjustments

Alarm Codes and Diagnostics

Alarm Codes: Electrical Errors

Alarm Codes: System and Miscellaneous Errors

Wiring Diagrams: ZXD Units

Wiring Diagrams: ZX/ZXL Units

Wiring Diagrams: ZX/ZXL-TF5 Units

Wiring Diagrams: ZX/ZXL-TFD/TF7 Units

Wiring Diagrams: ZX/ZXL-TFD/TF7 BOM 481

System Start-Up and Operational Checklist

Client and System Details Recording

Fields for recording client information, unit details, and system operating parameters.

Operational Checks and Comments Entry

Sections for recording system checks, refrigerant charge, and observations during start-up.